- Existing roof assessment and structural review
- Tear-off and disposal
- Underlayment, flashing, penetration detailing
- Composition shingle, concrete tile, clay tile, standing-seam metal, or flat-roof single-ply membrane
- Skylight replacement and integration
- Solar mounting system design and structural coordination when solar is being installed same-contract
- Manufacturer warranty registration
- Final inspection and punch list
- Owners replacing an aging roof (composition typically 20+ years, tile 40+, metal 25+)
- Homeowners doing a whole-home remodel where the roof is due
- Owners planning a solar retrofit who want the roof and the array installed as one integrated system
The integrated-with-solar angle.
If you're getting solar installed within two years of when you'd otherwise need to re-roof, do them together under one contract.
The array pierces the roof in a dozen places. If the roof underneath fails five years later, removing the array to redo the roof costs more than the roof did.
We plan the mounting locations before the underlayment goes down. Fewer penetrations. Better flashing. One contract instead of two.
Re-roof scope typically runs 1 to 3 weeks from start to punch list, depending on square footage, tear-off complexity, and material. Solar-integrated re-roofs run longer because the array design and structural coordination fold in. We give you the specific range during the assessment.