Custom Home Construction

Ground-up single-family builds. Hillside, flat lot, coastal jurisdiction. One contract from raw dirt to the day the lights turn on.

What we handle
  • Architect and engineer coordination — structural, MEP, civil
  • Soils report and geotechnical review where the lot requires it
  • LADBS residential plan check, corrections, and permit issuance
  • Coastal Commission jurisdiction where the lot falls inside the coastal zone
  • Hillside grading, retaining walls, foundation systems (spread footing, mat, caissons where required)
  • Framing, MEP rough-in, envelope, roofing, high-performance windows and doors
  • Title 24 energy modeling and compliance
  • Integrated PV and battery-storage design when the energy stack is being built in
  • Interior finishes coordinated with the design team
  • Final inspection, certificate of occupancy, punch list, and close-out
Who this is for
  • Owners building a primary residence on a lot they already own
  • Buyers who've bought a teardown and want a new home in its place
  • Multi-generational family projects where the build has to accommodate a specific program (accessibility, aging-in-place, multi-family layout)
Typical scope and timeline

Ground-up custom homes in LA run 14 to 22 months from permit issuance to certificate of occupancy, depending on lot complexity, coastal jurisdiction, and design detail. We tell you where in that range your project sits during pre-construction — not at framing.

Start a project.

Every project begins with a conversation. Call(310) 948-7099or use the inquiry form.

Start a custom home project